Example
If an activity has optimistic duration 6 days, pessimistic duration 4 days and most likely duration 5 days then the expected duration is equal to 5 days.
Example
If an activity has optimistic duration 6 days, pessimistic duration 4 days and most likely duration 5 days then the expected duration is equal to 5 days.